Central Office Engineering |
|
- Trunking Diagrams
- Trunking Schematics
- Line Circuit Projections
- Switch Requirements and
Specifications using RUS Forms 522 and 525
- Installation,
Inspection and Testing Requirements
- Technical Data for
application engineering and detailed equipment requirements
- Switch Reliability and Traffic Report
- Grounding System Audit
- Translator Function Chart
- Trunk Circuit Requirements
- Custom Calling Forecast
- Access Line Data
- Requirements of Central Office Switch
|
- Billing Data
- Facility Maintenance Requirements
- Power Equipment
Requirements
- Building and Floor Plan Information
- Performance Specifications for Line Concentrators
- Installation and Cutover assistance and procedure coordination
|
| Close Window |