O.S.P. CPR

Continuous Property Records Development

  • Field Inventory Outside Plant Facilities
  • Reconcile existing CPR database
  • Correct facility Drawings
  • Verify Landbase Maps
  • Verify route and pole Numbering
  • Verify pole Ownership
  • Verify Attachments
  • Verify cable Spans

 

  • Verify cable Sizes and Taper points
  • Verify aerial and buried Drops
  • Verify Stub Poles
  • Verify Guys and Anchors
  • Verify subscriber and building Locations
  • Verify Boundaries and Tax Districts
  • Verify Right of Way
Close Window